Industrial gas production pneumatic valve setting rules
by:AIRWOLF2021-01-15
a, all the gas workshop of import and the gas equipment in front of the gas piping shall be a separate set of pneumatic valve, pneumatic valve installation height should not be exceeded.
m;
2, each burner gas take over, have to have separate device gas pneumatic valve opening and closing tags;
3, each mechanical blast burner, necessary device in air duct with pneumatic valve opening and closing tags;
4, large or parallel arrangement of blower, its export necessary device for pneumatic valves;
5, tossing in tube, necessary before sampling, piezometric tube device of pneumatic valve.