Questions about the high pressure solenoid valve pressure solenoid valve installation time attention points, before installation should refer to the product specification, whether meet your demand.
And piping should be rinsed clean before using, medium not clean the filters should be installed, and to prevent impurities may not impair the normal work of the solenoid valve.
, long after discontinuation of solenoid valve, should be no clear after coagulation and convenient use;
When unpick and wash all parts are to put away again restorable installed in sequence.
, the electromagnetic valve is generally one-way work, can't reverse loading, the movement direction of the arrow on valve is line, must be consistent.
Freezes, the electromagnetic valve in the place to work shall be heat treated, or set the heat preservation measures.
, electromagnetic valve installation is general level of the valve body, vertical coil, and some products can be installed arbitrarily, but best vertical when conditions permit, to increase service life.
, the electromagnetic coil lead wire (
Connectors)
After connection is good, should confirm whether firm, join electrical components contact should not shake, loose will cause electromagnetic valve does not work.
Continuous production of solenoid valve, had better use the bypass, easy maintenance, does not affect production.
The structural characteristics of the forerunner diaphragm, the highest pressure.
M mpa air force, Marine products, compact design, exquisite beautiful and low temperature, no noise, no leakage, action quick response and high frequency German technology, export series, quality and reliable.
Containing impurities such as medium, the valve must be installed before the filter (
Mesh is greater than or equal to mesh/cm)
;
And no solidification or crystal phenomenon.
The working principle of the high pressure solenoid valve is a kind of pilot operated normally closed valve, when the coil current, magnetic field, pilot valve is opened, the lower the upper piston stress at work, which rely on differential pressure to the piston to the top, pipe flow, whereas the coil power, piston, thus truncation pipeline.
, out of the former should check whether the packing is complete, when unpacking the case should check whether the product is in good condition, whether complete, the technical documents and accessories such as damage or defect, please contact the transportation department and my company.
, product if no installation, can be stored in the environment temperature is zero to four degrees, relative humidity is not more than eighty percent of the indoor, if directly on the ground, you must pad with dry wood, paper lay asphalt, in case of moisture.