Ordos city, to strengthen security by pneumatic valve check work
by:AIRWOLF2021-01-20
as the growth of the number of special equipment, safety check pneumatic valve has become an important content of special equipment inspection.
In order to ensure the safe operation of the boiler, pressure vessel and other special equipment, ordos city, who has taken many measures, to strengthen security pneumatic valve check work.
it is a full inspection team, and constantly improve inspection personnel technical level.
New hires a full inspection team, professional and technical personnel has to send professional personnel to suzhou and other places for pneumatic valve check safety training, by taking part in the national, the security of the whole pneumatic valve check special study, make inspection personnel technical specification for safety of the pneumatic valve had a deeper understanding and the understanding, to the safety of the pneumatic valve check maintenance and common fault elimination method to master the more, and more specifications to the requirement of safety pneumatic valve calibration records, makes a further improve the quality of the inspection report.
the second is to enhance investment in equipment.
Pneumatic valve to improve the existing security check equipment status, ensure accurate and reliable test data, which actively raise funds, in the past has two online calibration equipment and on the basis of purchase a online calibration device (
圣-
-
Ⅴ)
And the station equipment and purchased before two devices than was carried out.
After the comparison, the new equipment to use more portable, joint configuration is more comprehensive.
3 it is to strengthen the awareness of service enterprises.
To enhance service levels, which adopt the method of sent door-to-door service for large enterprises large lay particular stress on is not easy to move the security check pneumatic valve, pneumatic valve problems arise in the security initiative and rushed to the scene to help enterprises solve the enterprise due to the lack of professional and technical personnel, fault cannot be ruled out the practical difficulties in time.
(
Feng Xuguang)