Cylinder under the condition of field use, but still have to pay attention to the following basis points:.
Cylinder is installed before use, should first check the cylinder is damaged during the transit, whether loose connection parts, and then install and use.
。
When installation, the cylinder piston rod can be transverse load shall not be under eccentric load, should make the loading direction is consistent with the axis of the piston rod.
。
No matter what type of installation is employed, must ensure that the cylinder body does not produce distortion, the installation of the cylinder base has enough stiffness, are not allowed to load and the piston rod connected by electric welding welding.
。
When placed horizontally, cylinder, especially long stroke cylinder with level in the three o 'clock position (
The piston rod all stretched out, middle, and all return)
Inspection.
。
Speed adjustment of the speed control valve (three
One-way throttle valve)
Of the opening in the middle of the adjustment within the scope of the position, then gradually adjust the output pressure of pressure reducing valve, when the cylinder is close to a predetermined speed, can determine the working pressure, and then use speed control valve for fine-tuning, finally adjust the buffer of cylinder, adjust the needle valve buffer so get absorption of inertia of the piston, the ultimate speed and does not impact cylinder head is advisable.
。
Cylinder after the installation, within the scope of the work pressure, running without load time, check whether the cylinder is working properly.
。
If used with adjustable buffer cylinder, before starting work, buffer valve should be tuned to damping the minimum position, after normal work of the cylinder, then gradually adjust buffer needle valve, increasing the buffer damping, until satisfied.
。
Using the CA, CB, TA, TB, TC type installation type cylinder, should add lubricating oil regularly in the installation combining parts.