Article 15 the points for attention during the pneumatic ball valve repair 3)
by:AIRWOLF2021-01-16
(
)
Must first determine the upstream and downstream piping pressure pneumatic valve, is only in the demolition work breakdown.
(
)
Decomposition and reassemble the parts have to be careful to prevent damage the sealing surface, especially the nonmetallic parts, remove the o-ring, special tools should be used.
(
)
Flange assembly bolts must be symmetrical and uniform gradually tighten.
(
)
Pneumatic valve cleaning agents should be in rubber parts, plastic parts, hardware and working medium (
Such as gas)
So compatible.
Working medium for gas, gasoline,
GB -
)
Clean the metal parts.
Non-metallic parts cleaning with water or alcohol.
(
)
Break down each part, but through cleaning soaking method.
Not from the decomposition of non-metallic parts can be used to clean metal small part with cleaner impregnated silk (
To prevent the loss of part of the fiber adhesion)
Scrub.
Cleaning, remove oil, dirt, rubber, dirt and other material from the adhesive on the wall.
(
)
Non-metallic parts shall be immediately deleted from the cleaning agent, after cleaning not soak for a long time.
(
)
Volatile after all things after cleaning cleaning detergent (
Dip in detergent can not rub silk)
Assembly, but not a long time, walls, or it will rust and dust pollution.
(
)
And then also need clean water in new assembly parts.
(
)
Grease lubrication is used.
Grease should be a metal ball, rubber parts, plastic parts and working medium compatibility.
Working gas and can be used for medium, such as special grease.
With a pair of rubber seal with a thin layer of grease surface coated with a thin layer of grease groove seal installation, pneumatic valve stem seal face and friction surface coated with a thin layer of grease.
(
)
Congress should not let the metal debris, fiber, fat,
In addition to the provisions)
Dust and other impurities, foreign body contamination, or enter a cavity adhesion or stay in workpiece surface.